ISO 22000:2018 essentials · Lesson 8
Clause 8.5.4: Hazard control plan (HACCP/OPRP plan)
By pressing play, YouTube (Google) loads the video and may store cookies on your device. Privacy notice
Overview
The hazard control plan is where the analysis becomes action. ISO 22000:2018 Clause 8.5.4 asks for a plan that covers critical control points and operational prerequisite programmes. Clause 8.5.3, validation, comes first.
What the clauses ask
- 8.5.3 Validation: show before you rely on a control measure that it can really control the hazard, and repeat the validation after a change.
- 8.5.4 The plan: for each control point, set critical limits or action criteria, how it is monitored, who does it and how often.
- Decide what happens when a limit is not met, who is told and what happens to the product.
- Put the plan into use, with records.
In practice
For example, a demo business such as Acme Kitchens Ltd would set a core temperature as a critical limit, monitor it at every batch and record what is done when a reading falls outside the limit. Sensors can take the reading, but the plan and the action stay with people.
In Krateon, the critical control points page holds the limits and monitoring, and temperature sensors can supply readings. See How to set critical control points and limits and How to connect temperature sensors in Help. This lesson uses clause numbers and titles only, with no text from the standard.
In this lesson
Source: ISO 22000:2018, catalogue page. Krateon Fundamentals. Research, not legal advice. Clause numbers and titles only, with no text from the standard.
Want to put it into practice?
Krateon organises GDPR, NIS2, ISO 27001, ISO 9001 and ISO 22000 for your organisation, with drafts built from your own records.
Get started