How to set critical control points and limits

By pressing play, YouTube (Google) loads the video and may store cookies on your device. Privacy notice

By pressing play, YouTube (Google) loads the video and may store cookies on your device. Privacy notice

The Critical control points page turns each hazard your team classed as CCP or OPRP into a plan, then holds the readings taken against it.

Before you start

  • The hazard analysis has at least one hazard with the result CCP or OPRP.
  • It helps to name the HACCP team first. The team leader is usually filled in as the monitor of each new point, or the Temperatures and CCP holder if someone holds that optional role.
  • You are an owner, admin or member. A contributor with this module assigned can record and correct readings. The plan and verification records are read only for them.
  • Your package includes ISO 22000.

Terms on this page:

  • A critical control point (CCP) is a step where a hazard must be controlled and each check is measured against a critical limit. The critical limit is the value that separates acceptable from unacceptable food, for example a core temperature of at least 75 °C. A reading on the wrong side of it means the food may be unsafe.
  • An operational prerequisite programme (OPRP) controls a significant hazard against an action criterion instead of a critical limit. The prerequisite programmes (PRPs), the everyday hygiene basics, have their own page.
  • Monitoring is the routine check, at every batch or on a schedule, that the step stays within its limit.
  • Validation is evidence that the limit really controls the hazard. Get it before you rely on the limit, and again after a change to the recipe, the equipment or the batch size.
  • Verification is a separate, regular check that the plan works. It is done by someone other than the person who monitors.

Step by step

1. Open the control points

Open Critical Control Points under Food Safety in the menu.

Three buttons at the top switch the view: Control points (the points and their plans), HACCP plan (the plan as a table, per process) and Records (the readings, per month).

2. Create the point from its hazard

a. In the card Categorised, but not yet planned, find the hazard.

b. Press Plan it.

The point opens at once, numbered CCP 1, OPRP 1 and so on, with the team leader usually filled in as the monitor, or the Temperatures and CCP holder if someone holds that optional role.

3. Ask for a proposed plan (optional)

The plan is drafted with AI.

a. Press Draft the plan for {n}, where {n} is the point number. The button shows the cost before you press it: 2 credits.

b. In "Proposed plan for CCP-1" (the number is your control point's), read each part. Nothing is ticked for you.

c. Tick the parts you want to keep. Only the ticked parts are written, and only into empty fields.

d. If the proposal ends with Before this plan stands, decide:, answer those questions with your team before you use the plan.

The proposal never fills in who monitors or who verifies.

4. Set the limits

On the Plan tab, the block is Critical limits · 8.5.4.2 for a CCP and Action criteria · 8.5.4.2 for an OPRP.

a. Press Add for each thing you measure.

b. Fill in the Parameter, for example core temperature.

c. Choose the Comparison: at least (≥), at most (≤), exactly (=), between, or observation (judged, not measured).

d. Fill in the Value and the Unit. For between, fill in the Upper value instead of the unit.

e. Check Reads as: this is what goes on the printed plan.

A reading cannot be saved until the point has a limit.

5. Plan the monitoring

a. In Monitoring · 8.5.4.3, fill in What is measured and How.

b. Choose How often, from Continuous / automated to Monthly.

c. Check By whom.

d. If the point covers several pieces of equipment, add each one under Units under this point with Add unit.

A point checked Every batch or Every service is never shown as overdue, because no check is due on a day with no batches.

6. Decide the corrective action in advance

In When the limit is not met · 8.5.4.4, write the Corrective action: first what happens to the food, then what happens to the process.

When a reading breaks the limit, this text goes into a corrective action that the app raises for you.

7. Record the validation

In Validation · 8.5.3, fill in Evidence the limit works, and name where each figure comes from.

8. Plan the verification

a. In Verification · 8.8, fill in the Activity.

b. Choose How often.

c. Fill in By whom. It must not be the person who monitors.

Every change is saved as you type.

9. Record a reading

a. Press Record a reading.

b. Type each value. Next to each value you see In limit, Breach or To judge.

c. Check Recorded by. It is filled in with the planned monitor, so change it if someone else took the reading.

d. Add a Note if needed, then press Save record.

A breach raises a corrective action numbered in the form CAR-001, due 14 days later, places the product on hold in Non-conforming and sets the point to Deviation.

10. Correct a reading

a. Open the Records tab of the point and press Correct this on the reading.

b. Fix the values and press Save correction.

Readings cannot be edited or deleted, so the original stays in the log, marked Corrected.

11. Record a verification

a. Press Record verification.

b. Check What was done.

c. Choose the Outcome: Effective, Issues found or Not effective. For anything other than Effective, fill in the Findings.

d. Fill in Verified by, then press Record.

An outcome other than Effective raises a corrective action, because a plan that does not work is a finding in itself.

12. Read and print the records

a. Open the Records view.

b. Choose the control point and the month. The Monthly sheet shows one row per day and one column per unit.

c. Press Print this control point to print this point's records for that month, or Print all control points to print the records of every point.

A red cell is a reading outside the limit.

13. Place the points that have no process

On the HACCP plan view, the table HACCP plan: No process lists every active control point whose process was deleted, is no longer active, or was never set.

a. In Move to a process and step, choose the process and step where the point belongs.

b. Or press Delete and confirm. Only owners and admins see it.

The table shows only when it has points. Deleting a point does not delete its monitoring records, and its hazards show again in Categorised, but not yet planned.

Example from a kitchen

What Krateon saves

For each point: the number, the title, the linked hazard, the limits, the monitoring, the units, the corrective action, the validation and the verification plan, with the date and name of the last verification.

Readings and verifications are only ever added. A correction is a new record that points to the old one.

Where it shows up later:

  • HACCP dossier, section 5 (Critical control points and the HACCP plan) and section 6 (Monitoring of control points and its records). Section 5 prints the points with no process under the heading No process, after the processes' table.
  • Calendar and alerts. When monitoring and verification are due, and points in deviation or not monitored.
  • Overview. The row Readings outside a critical limit.
  • Corrective actions and Non-conforming. The corrective actions raised by breaches and failed verifications, and the items held after breaches.
  • System origin and upkeep. A change to an existing limit is listed as a cause for review.
  • Setup bar. The step Set critical control points and limits is done once a point exists.

If something goes wrong

What you seeWhat it meansWhat to do
"This page is not enabled."ISO 22000 is not switched on for your organisation.Contact support at hello@krateon.com.
"Included in {what}" with the button Ask for itYour package does not include ISO 22000. The page is read only.Press Ask for it.
"The records could not be loaded."The page could not read its records. This does not mean that nothing is recorded.Press Try again.
"No control points yet"No hazard has been planned as a control point.Press Open the hazard analysis and answer the decision tree there.
"No limit set. A control point with nothing to measure against cannot be monitored, and readings taken now will not be judged as passing."The CCP has no limit row.Add the limits (step 4).
"This control point has no critical limits, so nothing can be judged. Set a limit on the Plan tab first."You opened the reading form on a point with no written limit.Add the limits on the Plan tab (step 4), then record the reading.
"Outside the critical limit. Saving this will raise a corrective action and mark the control point as in deviation."A value you typed is outside the limit.Check the value. If it is right, save it and carry out the corrective action.
"Something here cannot be judged automatically. The record will not read as “in limit” until a person confirms it."A value cannot be judged by the app, for example on an observation row.Save the reading, then confirm it straight away: on the record, press Confirm the judgement, choose Within the criterion or Outside the criterion under Decision, and press Save the confirmation. Outside the criterion raises a corrective action and puts the product on hold, as a breach does, so carry out the planned corrective action. Until it is confirmed, the point reads To judge.
"overdue" in Last checkThe next scheduled check has passed with no reading.Take the reading and record it (step 9).
"That is the same person who monitors this control point. Clause 8.8 asks for an independent check: recording it this way is a finding waiting to happen."The verifier is the same person as the monitor.Have someone else carry out the verification.
"Required: Verified by"You pressed Record without a name in Verified by.Fill in Verified by, then press Record again.
"{n} verifications in a row found problems. That is the control measure, not the shift: 8.8.2 asks for this to be analysed."Several verifications in a row were not effective.Review the control measure and the limit with the HACCP team.
"To move them, add a process with steps on the hazard analysis page."No process with steps exists to move a point with no process to.Create a process with steps on Hazard analysis, then move the point (step 13).
"Could not draft the plan"The proposed plan did not complete.Try again, or fill in the plan yourself.
"The draft had nothing for the empty fields of this point."Every field the proposal covers is already filled in.Edit the fields yourself.
"Your role does not allow this change."Your role does not allow this change.Ask an owner or admin of your organisation.
"Something went wrong. Please try again."A general error with no known cause.Try again. If it repeats, contact support at hello@krateon.com.